But I bet the planes gets all the attention they needs? I think Larry and I should have a contest to see who has the most unfinished "projects" going at any one time,
Don't you have to start a project before it's considered "unfinished"?
OK, let's count 'em!
1 - Brasilia Belle Epoque: torn down, waiting to go to polishers and reassembly. Mrs T already bought a nice table for this to be displayed on in the living room, so it'll get bumped to the head of the line.
2 - Bunn ES-1A: painted & powder coated, waiting for drip tray grate & front panel to come back from polisher, then reassembly.
3 - La Victoria Mini Family: waiting for a switch, then reassembly. To be displayed with #4 in a wall nook.
4 - La Pavoni Pro: torn apart for chrome polishing and pressurestat replacement, then reassembly. For display w/#3.
5 - Gaggia Classic: waiting for chassis to come back from powder coater, then mod & reassembly. Backup machine in case #2 ever breaks.
6 - Old White Gaggia Coffee - everything ready to go, just waiting for me to get to it. Friends backup machine, no hurry he says.
7 - Gaggia Carezza: doing PID, OPV, steam wand mods, then reassemble. Test machine.
8 - Bunn ES-1A: this is the one I'm using now. Once the keeper is finished it'll be stripped, descaled, and checked for damage; then sold to the highest bidder.
9 - Hottop B: in like-new condition, just waiting for the milowidget.
10 - Hottop B: NIB, waiting for a milowidget & a chance to unload it.
11 - UFO/CO: rewiring the turbo oven to eliminate all switches & thermostats; for use with router speed control. Rewiring the Stir Crazy so heat is switched, so I can throw a lot of heat into a roast at any given point.
There are more, but since I haven't actually begun working on them, they don't count as
projects yet.